Project Information
Project Title:
Operation of Emergency Maintenance Teams and Execution of Superstructure Maintenance for 12 Months at High-Speed Train Lines 85 and 86 Railway Maintenance Directorates
Region:
TCDD (YHT) 8th Regional Directorate
Performed Works:
6 Line Maintenance and Repair Teams
Aluminothermic Welding
Machine Welding Using Mobile Flash Butt Welding Machine
Topographic Measurements on Tracks and Turnouts Prior to Machine-Aided Repairs
Rail Grinding
Non-Destructive Testing on High-Speed Train Lines
Replacement of Concrete Sleepers on Bridges, Tunnels, and Tracks
Protective or Corrective Grinding on Rails and Welded Areas
Ballast Loading Using Construction Machinery
Ballast and Shoulder Regulation, and Weed Removal on Tracks and Turnouts
Operation of Rubber-Tired Excavator
Operation of Lowbed Trailer
Operation of Dump Truck