Beytepe Neighborhood, 5397 Street, No: 1C/4, Çankaya / ANKARA
+90 (312) 240 25 30

Project Information

Project Title:
Operation of Emergency Maintenance Teams and Execution of Superstructure Maintenance for 12 Months at High-Speed Train Lines 81, 82, 83, and 84 Railway Maintenance Directorates, Service Procurement

Region:
TCDD (YHT) 8th Regional Directorate

Performed Works:

8 Line Maintenance and Repair Teams

Aluminothermic Welding

Machine Welding Using Mobile Flash Butt Welding Machine

Topographic Measurements on Tracks and Turnouts Prior to Machine-Aided Repairs

Rail Grinding

Non-Destructive Testing on High-Speed Train Lines

Replacement of Concrete Sleepers on Bridges, Tunnels, and Tracks

Protective or Corrective Grinding on Rails and Welded Areas

Ballast Loading Using Construction Machinery

Ballast and Shoulder Regulation, and Weed Removal on Tracks and Turnouts

Operation of Rubber-Tired Excavator

Operation of Lowbed

Operation of Dump Truck